Motor Long Lead

£8.77

Single Motor Long Lead Replacement Part for K’Nex Classic Range

Requires two “AA” batteries (not included).

Sold out

Want to be notified when this product is back in stock?

UK delivery from £2.99 via Royal Mail 2nd Class.
  • Secure checkout
  • No minimum spend
  • Shipping shown before payment
SKU: 92875 Category: Tag: